Tokhir F. Makhmudov and Adkham N. Ramatov (2026) “Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System”, PROBLEMS OF ENERGY AND SOURCES SAVING, 3(3), pp. 102–111. Available at: https://energy.tdtu.uz/index.php/journal/article/view/416 (Accessed: 22 October 2026).