Tokhir F. Makhmudov, & Adkham N. Ramatov. (2026). Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System. PROBLEMS OF ENERGY AND SOURCES SAVING, 3(3), 102–111. Retrieved from https://energy.tdtu.uz/index.php/journal/article/view/416