[1]
Tokhir F. Makhmudov and Adkham N. Ramatov 2026. Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System. PROBLEMS OF ENERGY AND SOURCES SAVING. 3, 3 (Oct. 2026), 102–111.